
As a reminder, a completed final application package with all supporting documentation must be submitted by December 15, 2023. Completed final application packages received after December 15, 2023 will be considered for the 2024 Program Year and subject to 2024 incentives.
- A completed final application package with all supporting documentation includes copies of all itemized and paid invoices detailing the specific equipment purchased and manufacturer specifications for the specific equipment installed.
Custom Program Application
Our Custom Program offers large business customers rebates to reduce the upfront cost of purchasing higher efficiency equipment, including lighting, HVAC, motors and more. Customers can choose from a prescriptive list of measures with set incentives or submit a custom project proposal with incentives based on kWh savings achieved.
Application Process
- Submit the following pre-application documents provided below:
- Part 1: Pre-Notification Application
- Part 2: The appropriate Prescriptive and/or Custom Measure Worksheet(s) – see below
- Receive notice of reservation of funds.
- Install equipment.
- Submit the following final application documents:
- Part 1: Final Application
- Part 2: The appropriate Prescriptive and/or Custom Measure Worksheet(s) – see below
- Receive rebate approximately 4-6 weeks after submitting completed application.
Part 1: Rebate Application: Contains option for both Pre-Notification and Final Application.
Part 2: Custom Measure Worksheets
- Custom Lighting Worksheet 1 — For projects with a wattage reduction and no change in operating schedule. Updated 4/28/2020
- Custom Lighting Worksheet 2 — For projects with a Wattage Reduction and a change in schedule. Updated 4/28/2020
- General Custom Worksheet — For projects that do not fit into the other custom worksheets
Room Count
Please download and use this room count for lighting application submissions.
Eligibility
Only UniSource customers on these commercial pricing plans are eligible to participate in this program:
Description | Rate Code |
Small General Service | EGSGS |
Small General Service Time-of-Use | EGSGST |
Large General Service | EGLGS |
Large General Service Time-of-Use | EGLGST |
Large Light and Power Service | EILPS |
Large Light and Power Service Time-of-Use | EILPST |
Interruptible Power Service (Frozen) | EGIPS-F |
Energy-efficient equipment purchased, work contracted and work completed prior to the program start date are not eligible for incentives.
Incentives are capped at up to 50% of the incremental cost per prescriptive measure and up to 50% of the incremental cost on custom measures. The incremental cost is the difference between the cost of installing a high-efficiency equipment and the cost of lower-cost standard equipment.
Due to revisions to the Business Energy Solutions program, please note that previous program applications and worksheets cannot be used. Please download the updated application and supporting materials and submit them for your 2023 projects. Please refer to the Policies & Procedures document for a full description of program rules and guidelines.
Funds are not reserved until you receive a funding reservation notification.